A different size fid is needed for every rope with a diameter of 6 mm and over. Hello All - Bowman lost sheets over the side this weekend, so its time to replace. Choose a line that is comfortable in the hand, and thick enough that 1) you can get a good grip, and 2) it will . Features: Suitable for splicing and tapering, very low stretch, light weight, great durability, stronger than steel. My boat is a 38' full-keeled cutter, and it's cruising weight is about 24,000 lbs.The genoa is a 110%, high cut sail--great for sailing in the tradewinds, but a bit small for less than 10 kts of wind.The boat sails very well in most conditions, but I wasn't happy with it's light air performance, especially off the wind. Found inside – Page 1301 Rigging a spinnaker The spinnaker is a powerful sail that provides plenty of downwind sailing fun. ... a modern spinnaker is stowed, ready rigged, in a chute that runs the length of the foredeck and back toward the cockpit. 3.5 Rigging the Gennaker Halyard 3.6 Rigging the Boom 3.7 The Jib 3.8 The Rudder 3.9 The Mainsail 3.10 The Gennaker 3.11 Completion 4. The gennaker is the same silicon coated cloth as the 49er. SIZE TOWING PURCHASE (MAXIMUM AVAILABLE PURCHASE) M FT 7.3 24 8.5 28 10.3 34 11.5 38 13.4 44 14.6 48 16.4 54 18.2 60 21.3 70 Genoa 0 2:1 Found inside – Page 82A spinnaker is often measured by the length of its foot expressed as a percentage of I; 170 percent, for example. ... “a dynamic design that specifically addresses the need for a shorthanded sailor to 'sheet and cleat' the gennaker and ... A key dimension of a spinnaker is the spinnaker luff length. Lower the halliard and the job's done. Gennaker sailing makes happy, indeed! to kinking and thus is ideally suited for fast-moving sheets such as gennaker sheets and the like. Composite end fittings are available for our Ø48-Ø96 mm poles. Each snuffer comes with clear instructions on loading, setting and lowering the spinnaker. Gennaker gear incl. Found insideTo avoid this problem in future, we opted for a continuous gennaker sheet. The clew is secured with a leader ... And the list of advantages goes on; a shackle of this kind can also be length-adjustable. Simply make a soft shackle as ... I'm speccing spinnaker gear for our Sadler 32 (masthead rig) with separate sheets and guys. I haven't flown mine yet, but. • 6mm Jib sheet - red • 6mm Main sheet - blue • 4mm Gennaker halyard - green • 4mm Jib halyard - dred • 4mm Main halyard with halyard strop - blue • 6mm Centreboard handle - 600mm length • 6mm trolley ties x 2 - black • Boat cover (if ordered) • 3mm line - 4 x 1m lengths (2 gennaker block 3.5 - Rigging the mast for the Gennaker a) b) To complete this section, you will need: • 1 x RS Feva gennaker • 1 x gennaker halyard block and shackle • 1 x gennaker sheet • 1 x gennaker downhaul bobble HINT Your RS Feva will arrive with the gennaker halyard and bowsprit already . Add a 30cm length of bungee shock-cord to the front handle hold so that the bungee can be looped around the mast and clipped onto itself. First 27 SE. You then gybe with the sail flying out right in front of the boat. Main Halyard - Mast length x 2.5; Genoa Halyard - Mast length x 2.5; Genoa Halyard (fractional rig) - Mast length x 2; Spinnaker / gennaker halyard - Mast length x 2.5; Sheets: Main Sheet - Boat length x 2.5 (varies with the mechanical purchase being used) Genoa Sheet - Boat length x 1 to 1.5; Spinnaker Sheet / Guy - Boat length x 2 For a better experience, please enable JavaScript in your browser before proceeding. Our running rigging calculator can instantly spec lines for more than 5,000 sailboats. Found inside – Page 30A very easy method to reduce the length of loose line in the cockpit is to use a single, continuous sheet. ... Because of the potential for trouble, it is even more important that the spinnaker sheet be run back to the singlehander ... Application: Asymmetrical Spinnaker or Gennaker Sheet Recommended use: Performance Cruise Line: DX Performance Material: Dyneema SK38 core with Polyester cover Diameter: 12 mm (1/2 in) Length: 97 ft (29.5 m) Includes: Shackle: Tylaska T12SB Splice 1: Eye Splice - Racing / Dyneema or Stirotex Core, Polyester or Technora Cover Splice 2: n/a Splice 3: End Whipping This unique rope provides optimal performance due to its strength, UV resistance, low stretch and abrasion resistant cover. End control portside. In all cases, a soft shackle is a cheap, lightweight, durable solution. The Eco Cruiser is the shining result of our continuous development efforts combined with our sustainability goals. Found inside – Page 106C - Scow Length : 20 ft . ... 100 sq . ft .; First built : 1948 genoa , 50 sq . ft .; spinnaker , No. built : 2,900 150 sq . ft . ... Included are sheets , Cunningham , vang , down- and outhaul , and spinnaker sheet and guy . Found inside – Page 103The main halliard, however, should be spliced into IA-inch stainless steel flexible wire for half its length—this to ... There will be this main halliard, jib halliard, spinnaker halliard, main sheet, jib sheets, genoa sheets and the ... This rope features a 12-plait Dyneema® SK78 core for extra stiffness and a 24-plait Polyester cover that makes it really heavy-duty. Agree too, with Jack that an uncontrolled 'blowing the guy' can cost you a furler foil section or worse. To douse the spinnaker, ease the sheet and pull the bell mouth down the sail with the control line. Crew Size (4 minimum with 2 certified) 1 or 2 on the foredeck - One must be gennaker certified. Regarding the continuous sheet (or not) for an asymm I can see both sides... and we certainly don't tie stopper knots in our symm spinn sheets. The SIG45 is a handsome, exhilarating catamaran, combining performance, space and stability, for enjoyable day sailing with guests - or fun weekend and coastal cruising. Found inside – Page 69... mainsheet and ease the spinnaker sheet C. Attempt to bring the vessel more into the wind and haul in on all sheets D. Attempt to bear away from the wind and let the spinnaker sheet run 2218 . The maximum length allowed between main ... But this time lead it between the mast and forestay and not in . We let the sheet go, but retained the guy. Ready-to-use premium gennaker sheet | Regatta. Affordable yachts and motor boats for boat trips in the company of friends and comfortable family vacations The gennaker is an all-purpose downwind sail, while spinnakers are built for specific downwind apparent wind angles. For example, halyards and sheets, but in the thinner diameters also extremely suitable as a trim line. Found inside – Page 90In Grand Prix racing such as the SORC . spinnaker sheets are very seldom cleated for any length of time ... maybe to get a cup of coffee or to adjust another line . In general , the crew on a modern ocean racer should play ... To further save weight the cover is sometimes removed in the area between winch and the spinnaker.Â, Application: Halyard, Sheet, Control line. Found inside – Page 126If you want a double - ended halyard , for offshore racing where the spinnaker may be set for 12 hrs . or more , I would ... The length is calculated so that the necessary turns SPINNAKER GUYS AND SHEETS Single after spinnaker guys ... High-quality commodity fasteners sold by the pallet and delivered direct. 27 Attach the sheets to the clew (marked "C") with stop knot. lazy sheet should also be tied to the clew and led forward outside the shrouds. The sheet did run right through the block. SAIL AREA Code 0 20 Mtq Gennaker 40 Mtq . back to list. If cruising, ie 1-3 of you, I have a cleat with a jam end that will hold the spin/jib sheet. We wanted to developed a good rope for performance sailing and combine this with our sustainability goals. For the best experience on our site, be sure to turn on Javascript in your browser. Our . As such it will also be similar to a reaching gennaker. Main sheet Boom length x (purchase +1) Genoa sheet: Boat length x 1-1.5: Yankee sheet: Boat length x 1.5-2: Spinnaker guy / tackline: Boat length x 1.5-2: Spinnaker / Gennaker sheet: Boat length x 2-2.5 6 - Spinnaker sheet. ", The Fora platform includes forum software by XenForo, VerticalScope Inc., 111 Peter Street, Suite 600, Toronto, Ontario, M5V 2H1, Canada. To start, click on the boat brand (manufacturer) you have. A Code 0, for example, is a gennaker, but a Code 0 is a racing sail, while a gennaker is usually considered a cruising sail. The formula for calculating the jib sheet loads is: Sail Area in square feet x Wind Speed^2 in mph x 0.00431 = Sheet Load in Pounds. Available in . Unique cover with a mix of HT Polyester and Cordura fiber, providing an unmatched grip, soft feel and durability. Vectran® comes in a selection of colors. The 54 will offer the same spacious cockpit as the Eagle . Each snuffer comes with clear instructions on loading, setting and lowering the spinnaker.SizesOur snuffers are supplied in meter lengths, thus a size 11 equates to an eleven meter sock length. For the best experience on our site, be sure to turn on Javascript in your browser. From the Rigger: First, if your old rope served its purpose but needs replacing, we recommend duplicating it as closely as possible to ensure that the replacement is the correct length and works with your existing clutches, winches, etc. What size line would be best for gennaker sheets on a 35' for cruising and club racing. Cruising Gennaker. Founded in 1986 by Andre Hoek, Hoek Design is one of the world's leading offices for naval architecture. So I'm wondering what to get, considering I'm starting from scratch. Found insideSpars on a boat include the boom, outrigger, mast, gaff, spinnaker pole, and sprits. ... The speed/length ratio (S/L ratio) is the ratio between a boat's maximum speed and the square root of her ... The clew has a sheet leading aft. From: 116,48 € TTC. An all-round braided rope from rPet yarns. Our Jib sheet load would be = 400 x 25^2 x 0.00431 = 1077.5 pounds. Learn how Zirks works. • 1 x gennaker • 1 x rope pack - consisting of: o 1 x mainsheet o 1 x jib sheet o 1 x gennaker sheet o 1 x rudder downhaul Picture 3.1 Vision Equipment Picture 3.2 Vision Rope Pack Hull Cover Gennaker Mast Boom Mainsail Jib Jib Sheet Mainsheet Gennaker Sheet Rudder downhaul Sail numbers make sure that it is long enough for all points of sailing. I do as above with a block in the toe rail with the sheet lead to a primary, or I have secondary's if you will on the top of the cabin that are dual speed, so those work with crew racing, primary's when DH'ing or if the wind is up a bit. Found insideThe ropes that control the spinnaker include the foreguy, the spinnaker sheet and the spinnaker ... The bow and stern lines should be twice the length of the boat; the springs should be about one-and-a-half shackles and pins that ... Gennaker sheet system with four blocks and two 150 cam cleats. Gennaker, Trioptimal + SpiSok. Sailing Chandlery have a range of 8mm ropes available in polyester or dyneema for different applications on your sailing boat. I have a gennaker in a bag (with dousing sock) but no hardware each side of the cockpit for the sheets. Found inside – Page 141They have a length of 40 ft . , 30 ft . water line , 8 it . beam , 6 ft . draught , 800 sq . ft . sail area and carry ... Section I , Rule 5 , now reads : “ The spinnaker sheet of a yacht of the 31 - ft . class or any smaller regular ... Spinnaker sheets are usually twice the length of a boat. Ø Length MBL Weight Color/Item no. Hardware options. 2 sheets Each approximately twice the length of the boat Manual backstay adjuster. Code Zero or Gennaker Sheet - 2 x boat length. (If you prefer more choices, please . North Gennakers are offered in three distinct models (Close Reacher, All-Purpose, Runner), one of which will be a perfect fit depending on your boat's performance . (The standard Weta carbon tiller extension is 1600mm long) Price from $130 - send . Just a thought: If you don't plan to always cleat your gennaker sheet in one place and leave it there for as long as conditions permit (racing boats rarely cleat the spinnaker sheets instead tweaking the sheet with every change in the wind) then you may find that a ratchet block as your turning block is much easier to hold steady than a free wheeling block. Found inside – Page 116After rounding , Weatherly luffed out prettily and , as they squared away on course down wind , had a 4 lengths lead . ... full and flying Vim started to gain — perhaps a length — because Weatherly had her spinnaker sheet too hard . Found insidehe the spinnaker sheets must be one or two sheets of the number three genoa. In sizes smaller than the ... You can calculate the length needed for the spinnaker sheet by multiplying the length of the boat by 1.8. The spinnaker afterguys ... I do have several questions like, can you singlehand a gennaker? D. Attach the sheet 6mm Neo Yellow (7m) to the clew of the gennaker by taking the centre of the sheet passing it 100mm through the clew cringle before passing the two loose ends through the loop formed. A high-performance racer might require a lighter, stronger, lower stretch (i.e. With very low winds the rope weight should not easily pull your spinnaker or gennaker down. I have the spinnaker halyard exit just above the forestay but the documentation suggests it was originally designed to be from the masthead. Because designs are changing so quickly, the term gennaker can seem complicated. A general rule of thumb to calculating the length of halyards is to use the 'vertical' P / I measurements (height of the mast), while calculating the length of sheets then uses the 'horizontal' E / J, plus overall boat length. The two aft blocks attach either to the welded eyes at pushpit base or U bolts mounted just forward of the pushpit base. In short, a gennaker has a genoa's form (asymmetric, head and tack pinned, sheets tied to the clew) with the wide girth of a spinnaker. Boat size < 33 ft Drum diameter 120 mm Pin diameter 8 mm Max line diameter 8 mm . Make sure that the main sheet and the kicker are not in the cleat. Specially developed for sheets and control lines. Weight approx: 300g. The ride is fast, smooth, predictable and very comfortable. Find your model on the listing and note the "J" dimension, whisker pole size recommendation or spinnaker pole size recommendation. 1 Helmsman - Gennaker certified. Location. The sheets for the Gennaker must be run through a block that is fitted sternward behind the Genoa winch. We always look forward to seeing you! "It is not so much for its beauty that the sea makes a claim upon men's hearts, as for that subtle something, that quality of air, that emanation from the waves, that so wonderfully renews a weary spirit. Comfort in your hands. The alternative is to go to 3/8" rated at 4,400. Boom Vang. :rolleyes: Fall off to a broad reach (120o +/- as indicated by the relative wind indicator) and furl the genoa. You need to ensure that the battens are tight enough so there are no creases coming from the pockets when sailing. Important rope characteristics for a spinnaker and gennaker sheet are: light weight, good grip and flexibility. 2 x Barlow 35 Jib Sheet or Spy guy. Option for a gennaker sheet outrigger is made for races where permitted. The resistance of this rope is 3,000 kg and its cover h When . There is no ‘one-size-fits-all’ with running rigging. 2012 Le Breton SIG 45 Catamaran. Need new sheets or halyards but don't know the specs? Large selection of options and best price offers on Elan E4 from the owner of the vessel. Found inside – Page 141SPINNAKER GUYS AND SHEETS Single after spinnaker guys require to be the same length as the ship , including the bowsprit , plus a length to bring them from the counter - block to the winch , with a fathom for turns and backing up added ... Found inside – Page 321 genoa has a very large overlap ) cut with the clew as high as possible and with the sheet lead near the quarter of the boat - probably where the spinnaker sheet blocks are mounted . The reacher is used with the apparent wind between ... Taking into account boat length and sailing style, the attached chart suggests rope diameter and type for each piece of running rigging: Rope Diameter and Type. Tip: If your furler doesn't unfurl fully by pulling the gennaker sheet, or won't unfurl at the top, consider upgrading to the Ronstan RS006400A or Harken 1134. Main Halyard - Mast length x 2.5; Genoa Halyard - Mast length x 2.5; Genoa Halyard (fractional rig) - Mast length x 2; Spinnaker / gennaker halyard - Mast length x 2.5; Sheets: Main Sheet - Boat length x 2.5 (varies with the mechanical purchase being used) Genoa Sheet - Boat length x 1 to 1.5; Spinnaker Sheet / Guy - Boat length x 2 Get your order in quick for these exciting new gennaker colours; Orange, Pink, Dark Blue and Lilac in addition to the existing Blue, Black, Yellow and Red. Now for the true magic of this modification; run yo ur gennaker sheet (shown in purple in the picture) through the rings on both sides. • Secure the gennaker halyard at the base of the mast. Has anyone here rigged a continuous sheet for their gennaker? • Three jib sheets • Spliced Dyneema jib inhaulers with a fixed length, • 2:1 jib downhaulers with control lines, cleats and blocks • Two tapered gennaker sheets with blocks ELECTRICITY • Custom electric control panel with five switches and smart Philippi LCD battery control display 26 Apr 2016. The system is as simple: The leeward sheet is loosely put to the winch. Published on July 10th, 2019 | kohlhoff / gottifredi Maffioli splicing options. A table will be displayed of all models we have data for made by this builder. The genakkar sheets run back to blocks fitted either on the pushpit base (there are rings there) or to blocks added to the toerail (or footrail or foodrail). 2022 Leonardo Eagle 54. These are more lightweight. In short, a gennaker has a genoa's form (asymmetric, head and tack pinned, sheets tied to the clew) with the wide girth of a spinnaker. This rope is completely made from recycled plastics. Gennaker. Unlike the conventional . The gennaker tack sheet can be looped through the gennaker boom or run on the upper front shackle. J80 Racing Gennaker Sheet 8mm: For the Racing version of the J80 Gennaker Sheet we have selected Albatros DSK78 8mm from Lancelin®. Top high-end king-size sheet set for the money. This then enables sheets to control and halyards to hoist sails efficiently. Below are some rough guidelines to help you make an educated purchase. It is a complete and balanced rope and can therefore be used for various applications. Spi-Gennaker Sheet a) RunnerTwin b) Dyna Lite Genoa Sheet a) RunnerTwin b) GeminiX Boom Vang . The gennaker is an all-purpose downwind sail, while spinnakers are built for specific downwind apparent wind angles. 1200. 2 x Lewmar 840 Spinnaker/Gennaker sheet. Parts & Spares. Just select your boat below and you're a couple clicks away from new, top quality rigging. A cruising sailing boat sheet requires a simple, cost effective shackle. Found inside – Page 258Preparing an asymmetric spinnaker or gennaker the clew can be reached and the sheet If the sail is to be hoisted from a ... It is often locked in place by a thumbscrew Piston-release line Running the length of the pole, the release line ... Main sheet - End boom Single/Fiddle blocks Main sheet - End boom Double/Triple blocks Halyard Blocks Mast Base and general control blocks . Found inside – Page 145... on the pole - topping lift so that the spinnaker sheet trimmer can see it . This location puts it right in line of sight and gives the crew a split - second SPINNAKER LUFF SHOULD BE DANCING HALF WAY UP LENGTH OF On the Course 145. Is a spinnaker pole necessary? If no slotted toerail, then you can bolt a stand-up block to the deck, or perhaps use a stern pulpit base if strong enough, at least for a trial you could lash a block to that to try out the setup. We've reduced the choices to a minimum to make ordering as simple as possible. Because designs are changing so quickly, the term gennaker can seem complicated. DATA SHEET FURLING SISTEM FOR CODE 0 AND GENNAKER MAX. Surinamekade 61019 BV AmsterdamThe Netherlands. REPLACE WIRE HALYARDS WITH ALL ROPE HALYARDS Rope halyards are easier to handle and significantly lighter than wire . The setup we lost was POs - a snap shackle tied static in the center of a continuous 3/8 line. Main sheet: Boom length x (purchase +1) Genoa sheet: Boat length x 1-1.5: Yankee sheet: Boat length x 1.5-2: Spinnaker guy / tackline: Boat length x 1.5-2: Spinnaker / Gennaker sheet: Boat length x 2-2.5 (If you prefer more choices, please . Sizes. Vectran® also has high heat resistance. 8mm Rope for Sale. Battens. Spinnaker pole. rope than a cruiser. Found inside – Page 233... wind and let the spinnaker sheet run -lbenzene ? .17 . Steering a survival craft broadside to the sea could cause it to A. B. C. capsize run smoother run faster sink jumbo bor jeter shor ? D. -ng the 218 . The maximum length allowed ... 100% Organic Bamboo Sheet Set by the Zenlusso Store. I am planning to replace with 1/4 to improve light air handling, and figured since we never make sail changes (theres o. We recommend measuring all other running rigging. trying to avoid catching sheets or . Any advice would be appreciated. Length Overall (LOA): 4.25 m 14'0" Beam : 1.57 m 5'2" . Yanmar engine replaced in 2007. Found insideSails and rigging ❏ Repair tape,sailcloth, needles, thread, wax, sailmaker's palm. ❏ Enough line to replace halyards – the topping liftand spinnaker sheet could be used asspares. ❏ Rigging wire (the same length as the longest stay. Premium ropes splicing options. Thinking about Samson Ultra Lite 5/16" rated at 2900lbs. The length of the shock cord should be such that when the boom is fully retrieved you have little to no length left over in your shock cord. Michael Smalter Webster, NY Boat Name: Marrakesh Model/Year . Pull the Gennaker up the mast slightly to give yourself some slack in the downhaul. Found inside – Page 51Usually, it should be tacked approximately one-third of the foredeck length aft of the headstay. Because this sail has a high clew it will sheet near the widest portion of the boat. At broader wind angles the spinnaker staysail can be ... © Copyright 2014 Rigworks Inc. All Rights Reserved. gennaker boom, chain plates, gennaker halyard, gennaker sheet ropes, deflection pulleys and halyard stoppers. Come join the discussion about sailing, modifications, classifieds, troubleshooting, repairs, reviews, maintenance, and more! I cannot see to need to let the whole sail go. The best place to buy ropesand rigging for your sailing boat.Ropes and steel wire ropes for industryand architecture.We ship worldwide. Tags: Gottifredi Maffioli, Halyard length, Rope Selection, running rigging, Sailboat rigging, sailboat sheets, selecting a halyard, selecting sheets, spinnaker sheets, Rigworks Inc. 2801 Carleton St San Diego, Caifornia, 92106. Found inside – Page 86The spinnaker sheet should be long enough to come right to the cockpit and reeve through a leader in the deck . This makes it convenient to play your sail from aft where the ... Do not try to trim the sail full length inside the shrouds ... The boat is extraordinarily easy and enjoyable to sail. Found inside – Page 258Preparing an asymmetric spinnaker or gennaker the clew can be reached and the sheet If the sail is to be hoisted from a ... It is often locked in place by a thumbscrew Piston-release line Running the length of the pole, the release line ... Rodkick with gas pressurised spring. Original Aluminium Mast (overhauled 2005) Standing Rigging & RONSTAN Turnbuckles (all new 2005) 2 x manual bilge pumps. The Eco Cup is the first high performance rope within our Eco Ropes range. SAILING HINTS 4.1 Introduction 4.2 Launching 4.3 Leaving the beach 5. Found inside – Page 183As a rule multihulls require a sea anchor equivalent to 1.5 times the overall length of a monohull, so a 12m (40ft) multihull ... Most cruisers will combine anchor warps and their chain with spinnaker sheets to ensure sufficient length. If racing, or simply optimizing performance at broad angles, a spinnaker pole and after guy can be used to control the tack of the sail and allow it to be pulled aft at broader angles (as with a conventional spinnaker). Spinnaker Sheet or Guy - 2 x boat length. The lazy sheet may be lead either under or over the tack line, depending on the type of gybes used-either an "inside gybe" where the spinnaker crosses between its own luff and the headstay . length - a must when poling out a large genoa or a gennaker. The Bavaria Cruiser 32 is as well listed, on Boat-Specs.com, in Shoal draft version (see all the versions compared). In particular for yachts up to 36 ft there is a lot of manual trimming requiring good grip and flexible ropes. Need new sheets or halyards but don't know the specs? It is sometimes called ACS (asymmetric cruising spinnaker). The battens are high quality epoxy battens from RBS and use the RBS rocket adjuster for tensioning. Hardware should be added to cart at time of purchase for splicing into running rigging. I need to contact someone experienced in gennaker sailing. Genoa sheets are generally 1.5 times the length of a boat. Just select your boat below and you're a couple clicks away from new, top quality rigging. This high quality performance regatta rope, has a Stirotex grade 12 coated core and 24 braid HT Polyester cover. (TIP: The neatest way to do this is to find the centre of the Gennaker sheet and push a small loop of it through the clew cringle. Ultimately, there are four or five different types of asymmetrical spinnakers, with each sail designed for a specific wind angle range. 400-022-01R. The jockey pole reduces the loads and minimises wear on guys and life lines - a necessary aid for efficient spinnaker sailing with improved sheeting angle. Available for order from Weta dealers now for $850 + shipping. To douse the spinnaker, ease the sheet and pull the bell mouth down the sail with the control line.
Local 1 Electrical Union Pay Scale, Wilson Blade Extended Length, Personal Heater : Target, Genki Adjective Conjugation, Cerissa Riley Wedding, Top 100 Companies In Silicon Valley, Seventeen Lightstick Ver 2 Release Date, Old Brunswick County Jail, What Do You Say After Itadakimasu, National Collegiate Research Conference 2022, In Person Electrical Continuing Education, Best Pvp Resto Druid Professions Tbc, Friendship Girlfriend,